No state law · Davis-Bacon still applies

North Dakota Prevailing Wage

North Dakota has no prevailing wage law and issues no state rates. That is the short answer. The longer one matters more: federal Davis-Bacon covers every federally funded North Dakota job, and on NDDOT work the certified payroll does not exist on paper at all. It is entered, approved and certified inside LCPtracker, on a seven-day clock, with a handbook that says exactly what goes in it.

3 free reports, no credit card · 14 free days on your first plan · $0 setup

Or run the wage and fringe math first →

Where North Dakota prevailing wage stands today

If you searched for North Dakota prevailing wage rates for 2026 and could not find a state rate schedule, that is because there is not one. No chapter of the Century Code sets a prevailing wage, so no North Dakota agency issues wage determinations by county and classification, and no North Dakota statute requires a certified payroll on a purely state or local job. The state's own transportation department says as much in its handbook: weekly certified payrolls are not required by NDDOT for employees working on state funded only contracts.

Three checks you can repeat yourself

We would rather you verify this than take our word for it, because a wrong answer here costs a contractor real money. These are the three sources we used, in the order we used them.

  1. 1

    The federal list of state thresholds

    The U.S. Department of Labor publishes a table of the dollar threshold at which each state's prevailing wage law kicks in. North Dakota has no threshold listed and sits with the states that have no such law, with no note beside it. The table carries a last revised date, so check that date when you read it.

    dol.gov state prevailing wage thresholds
  2. 2

    The Century Code itself

    Open Title 34, Labor and Employment. Its chapters run from General Provisions through Minimum Wages and Hours (34-06), Child Labor, Wage Collection (34-14) and the Directory of New Hires, and none of them is a prevailing wage chapter. Then open chapter 48-01.2, Public Improvement Bids and Contracts: thresholds, advertisement, bid opening, bonds, payments, construction management. No section in it sets a wage rate or asks for a payroll.

    ndlegis.gov Century Code Title 34
  3. 3

    The state agency that enforces wage law

    The North Dakota Department of Labor and Human Rights' wage and hour topics page lists what it handles: wage claims, complaint inquiries, independent contractor verification, youth employment, sub-minimum wage and employment agency licensing, and the minimum wage, overtime and break rules behind them. Prevailing wage, public works wages and certified payroll do not appear on it, because there is nothing for the agency to administer.

    nd.gov/labor wage and hour topics

No state law is not the same as no obligation

The single most expensive mistake a North Dakota contractor can make with this page is to read the headline and stop. Federal money brings Davis-Bacon with it, and Davis-Bacon carries weekly certified payroll, a signed Statement of Compliance, three-year record retention and real back-wage exposure. NDDOT federal-aid lettings, including the city and county projects it administers, are where most North Dakota contractors meet it, and NDDOT runs the strictest filing mechanics of any no-law state we have written about. The rest of this page is about that.

Sources: dol.gov Dollar Threshold Amount for Contract Coverage, ndlegis.gov Century Code Title 34, Century Code chapter 48-01.2, nd.gov/labor wage and hour topics, NDDOT handbook, section K.

NDDOT work: LCPtracker, the Prime Approver and the seven-day clock

This is the part no general prevailing wage article tells a North Dakota contractor. On federal-aid work let or administered by the North Dakota Department of Transportation, the certified payroll has one home, one approver, one deadline and a fixed list of contents, all in writing.

Electronic only, for every federal-aid letting since October 2017

NDDOT's Contract Special Provision, Mandatory Use of Automated Certified Payroll (03/07/2024): all contractors on NDDOT federal-aid projects, including city and county projects, must file weekly certified payrolls, the NDDOT requires the use of LCPtracker, and certified payrolls in paper form will no longer be accepted. The handbook dates it to the lettings of October 2017 onward. If your payroll software can upload records, the handbook says an interface is available; otherwise the payroll is keyed in.

A Prime Approver, and nothing is submitted until they approve

After award the prime designates an individual as Prime Approver, who oversees Davis-Bacon payroll for all subcontractors of all tiers on the project. The Civil Rights Division sets up the account automatically when the project is entered, and LCPtracker notifies the Prime Approver by email. The provision's words: until payroll is approved by the Prime Approver, it cannot be viewed by the NDDOT and it is not deemed submitted to the NDDOT. The handbook says the same about the Project Engineer.

Subcontractors are set up by the prime, from NDDOT's lists

The prime assigns subcontractors to the project in LCPtracker and makes sure every tier knows it must file electronically. Any subcontractor not on the Approved Subcontractor List or the Qualified Contractor List must register and be placed on one before it can be entered, and only Prime Approvers or the Civil Rights Division may enter subcontractors. If a payroll is rejected or a correction is requested of any subcontractor, the prime is responsible for seeing that the corrected payroll goes in.

Due within seven calendar days after the regular payment date

Handbook, section K: payrolls and compliance statements are due within seven (7) calendar days after the regular payment date of the payroll period. That is the same trigger as the federal rule, within 7 days after the regular payment date (29 CFR 3.4(a)), not the week ending date. The handbook also says the review of timeliness and accuracy is the prime's job, not the project engineer's, and that NDDOT's DBE supportive services consultant can help a prime having trouble getting payrolls out of a DBE firm.

What every weekly payroll must contain

The employee's full name and an individual identifying number such as the last four of the Social Security number, entered in LCPtracker as XXX-XX-last 4; the correct job classification or classifications; the hourly wage rates, regular and overtime, and fringe totals paid into plans or an hourly cash rate, or both where fringe is mixed; daily and weekly hours in each classification including actual overtime; total earnings; itemized deductions; and actual or net wages paid. A telephone number is encouraged and not required. Complete Social Security numbers, the handbook says, should never be placed on paper payrolls.

The e-signature is the Statement of Compliance

For LCPtracker to accept payrolls, the contractor must set up an E-Signature on LCPtracker and must certify each payroll electronically; the handbook calls it the equivalent of a pen and ink signature. What it certifies is the three-part statement you know from the WH-347: correct and complete; full weekly wages paid without rebate and only permissible deductions taken; and every employee paid not less than the applicable wage rate and fringe benefits, or cash equivalent, for the classification of work performed under the decision in the contract.

Overtime and fringe, as NDDOT reads them

Overtime is time and one-half the basic rate of pay for hours over 40 in the workweek; that basic rate cannot be less than the Davis-Bacon basic hourly rate and is the rate actually paid when that is higher, and fringe contributions and cash fringe are excluded from the computation. Fringe is owed on all regular and overtime hours and is not multiplied for overtime: the handbook's example is 50 hours at base plus fringe and 10 hours at half the base. Two classifications in one week: the basic rate in effect when the overtime was worked, or a weighted average, either one. Where an employee works two or more separately awarded contracts under different districts, cities, counties or consultants, NDDOT strongly recommends the rate in effect, and a weighted average has to be explained, with every calculation, in LCPtracker's comments on the certification page. Davis-Bacon hours and commercial hours in the same week go on two separate weekly payrolls.

Timekeeping NDDOT will hold you to

An employee's day starts when they check in for instructions, load, service or clean equipment, or ride in a company vehicle to the site, and ends after the same duties at the end of the day. Rounding is allowed to the nearest 15 minutes and no coarser: seven minutes or less dropped, 8 through 22 is 15, 23 through 37 is a half hour, and the handbook calls withholding the 15 minutes until fully worked a violation. There is no mandatory timecard form, but NDDOT strongly recommends that any change to a timecard be initialed and dated by both the supervisor and the employee, because the burden of proof is yours.

Three years, with LCPtracker holding a copy

All payroll records must be maintained and preserved by the contractor for three years following the completion and final acceptance of the project and made available at the request of FHWA, USDOL and NDDOT at any time in that period. The handbook adds that all records in LCPtracker will be retained by NDDOT for the required statutory period. Keep your own set anyway: a failure to keep accurate records may cause NDDOT to find for the complainant should a wage dispute ensue, and the prime is held responsible for restitution.

Interviews, posters and the home-office board

Spot interviews with project employees are conducted by the project engineer or NDDOT and completed in the onsite application, with each prime and subcontractor interviewed on at least one project in each NDDOT district annually. The bulletin board carries the three DOT 3350 posters, your EEO policy and grievance procedure, the Davis-Bacon labor rates, the North Dakota minimum wage and work conditions summary poster and the Job Service ND unemployment insurance poster. A subcontractor on site for under seven calendar days, or one that is extremely mobile, with a home office in North Dakota, may rely on a home-office board under the conditions the handbook lists.

Where we fit, honestly. NDDOT does not take a paper or PDF payroll on federal-aid work; the certified payroll exists only inside LCPtracker, under your e-signature. We are not an LCPtracker payroll interface, and the LCPtracker CSV we export is a flat table of the week's figures, not LCPtracker's own upload template. On NDDOT work, use us for the math and the record: the WH-347 we generate carries every item on the handbook's list of contents, and it is what you keep for your three years. The payroll itself you key into LCPtracker and certify there. Where we fit squarely is every other federally funded North Dakota job, housing, water and sewer, airports and federal buildings, where the funding agency or the prime takes the WH-347.

Sources: dot.nd.gov Davis-Bacon Wage and Payroll Requirements Handbook (September 2025), dot.nd.gov Contract Special Provision, Mandatory Use of Automated Certified Payroll (03/07/2024), dot.nd.gov Labor Compliance Program (Davis-Bacon), fhwa.dot.gov Form FHWA-1273, 29 CFR 3.4(a).

What still applies to North Dakota construction work

No state law does not mean no prevailing wage. It means the obligation comes from somewhere else, and you have to know which jobs carry it.

Federal money means Davis-Bacon

Davis-Bacon applies to contracts in excess of $2,000 for construction, alteration, or repair, including painting and decorating, of public buildings or public works. The Related Acts extend prevailing wage requirements to construction that federal agencies assist through grants, loans, loan guarantees and insurance.

Federal-aid highway work is the common case

Section IV of Form FHWA-1273, the federal-aid contract provisions, is applicable to all Federal-aid construction projects exceeding $2,000 and to all related subcontracts and lower-tier subcontracts regardless of subcontract size. NDDOT's handbook says every federally funded contract and subcontract carries the FHWA-1273, the Davis-Bacon labor rates and the LCPtracker special provision, and that the prime must put them in every subcontract at every tier.

Subcontract size does not save you

The $2,000 test is applied to the prime contract. A small lower-tier subcontract on a covered project is still covered, which surprises specialty trades more than any other rule in this area.

A tied project makes the whole contract federal

NDDOT's handbook: if a non-federally-funded project is tied to a federally funded project, the entire contract is considered federally funded and is subject to Davis-Bacon, so Davis-Bacon wages are paid and weekly certified payrolls are generated and submitted for all portions or segments of the contract.

Utility work, only when it is in the NDDOT-let contract

Whenever federal-aid funds are included in utility work, the handbook says Davis-Bacon applies only to the work that is part of an NDDOT-let contract, and not to utility-let contracts, including continuing contracts. Which contract your crew is working under decides it.

Truck owner-operators are a narrow exception, and the prime proves it

A bona fide owner-operator of a truck is outside Davis-Bacon, but the handbook makes the prime request, verify and hand the project engineer, before the driver starts, the owner-operator's name, a valid commercial driver's license, the vehicle registration in the owner-operator's name, the current vehicle license number, the truck number used on scale tickets and haul sheets, and any lease, which must be with a reputable dealership and not with the prime or a subcontractor. Owner-operators of other equipment are employees, paid Davis-Bacon and shown on the payroll.

Relatives and agency workers are covered

There are no exceptions on the basis of family relationships: relatives doing the work of laborers or mechanics on the site are paid Davis-Bacon and shown on the weekly payroll. Flaggers and others hired through a temporary employment agency must be paid Davis-Bacon and appear on either the contractor's or the agency's certified payroll; the agency is treated like a subcontractor, and if the wages cannot be recovered from it, the prime pays.

No state rate schedule to check

There is no North Dakota county-by-county wage determination. If a rate binds your North Dakota job, it came from a federal wage determination in the contract, from the contract specifications themselves, or from a collective bargaining agreement you signed.

Read the contract, every time

On a purely state or local North Dakota job with no federal money, wages and reporting are contract matters rather than statutory ones. NDDOT requires no certified payroll on a state-funded-only contract, but a city, county or school district can still write wage and reporting terms into its specifications, and those bind you as contract terms.

Sources: dol.gov Government Contracts, Construction, fhwa.dot.gov Form FHWA-1273, Section IV, NDDOT handbook, sections B, D, M and Q.

Where the rates that bind a North Dakota job actually live

There is no state page to bookmark. For federally funded North Dakota work the governing document is the wage determination in your contract, and the official source is the federal wage determination system on sam.gov. Pay the determination that came with your contract, not whatever is newest online. For highway work the handbook says the decision is posted on NDDOT's labor compliance page by published date, and it is explicit that payment is computed at rates not less than those in the decision incorporated into the contract, regardless of any contractual relationship alleged between the contractor, its subcontractors and their employees.

Finding the right determination

  • • Search the Davis-Bacon Act wage determinations on sam.gov
  • • You need the state, the county, and the construction type: building, heavy, highway or residential
  • • The general decision number is named in the contract, not guessed
  • • A classification the decision does not carry is conformed after award, through the Civil Rights Division to USDOL on an SF-1444 with employee statements; the handbook's example is bridge painters, which the highway decision does not list
  • • Look up Davis-Bacon rates by county

What is not a source

  • • There is no North Dakota state wage determination, current or historical
  • • No North Dakota agency publishes county prevailing wage scales
  • • Minnesota's or Montana's state rates do not travel across the line with your crew
  • • A union agreement rate still binds you if you signed the agreement
  • • A rate sheet from a prior job is a prior job's determination

We deliberately do not print wage rates on this page. Rates change, and a stale number on a marketing site is how a contractor underpays a crew. Use sam.gov wage determinations and the determination attached to your contract. Walkthrough: how to search SAM.gov for a wage determination.

The federal certified payroll rules behind it all

NDDOT's handbook sits on top of the federal Davis-Bacon requirements, and says itself that where it conflicts with a USDOL interpretation, USDOL controls. Know both. When a contract is silent or a project engineer points you back to the regulation, this is what the regulation says.

Weekly, not monthly

The contractor submits payroll information on a weekly basis for each week in which any covered work is performed. The handbook adds that covered employees are paid unconditionally and not less often than once a week, on a fixed workweek and a weekly payday, and that in LCPtracker the workweek is set up from the week ending date you choose.

Within 7 days after the regular payment date

The federal deadline runs from the payment date, not the week ending date: the payroll goes to the contracting or sponsoring agency within 7 days after the regular payment date (29 CFR 3.4(a)). NDDOT's seven calendar days run from the same point.

A Statement of Compliance every week

Each certified payroll carries a signed Statement of Compliance under 29 CFR 5.5(a)(3)(ii)(C), indicating that the payrolls are correct and complete and that each laborer or mechanic has been paid not less than the applicable Davis-Bacon prevailing wage rate for the work performed. On NDDOT work that signature is the LCPtracker e-signature.

Form WH-347 is optional but standard

The U.S. Department of Labor publishes Form WH-347 as an optional format that satisfies the requirements, carrying OMB Control No. 1235-0008. Federally assisted North Dakota work outside NDDOT, through HUD, USDA, the FAA or a federal building agency, is where the WH-347 itself is what gets handed in.

Keep the records three years

Payrolls and basic records are maintained during the course of the work and preserved for three years after the date of completion of the contract, covering name, classification, hourly rates including fringe contributions or cash equivalent, daily and weekly hours, deductions and actual wages paid. NDDOT counts its three years from completion and final acceptance.

Full Social Security numbers must never appear

A submitted weekly payroll must not carry a worker's full Social Security number. Use an individually identifying number such as the last four digits instead. Home addresses, phone numbers and email addresses stay off the submitted copy too; NDDOT keeps addresses and Social Security numbers with the contractor, produced on request.

Post the determination on site

The wage determination and the Davis-Bacon poster must be posted at all times by the contractor and its subcontractors at the site of the work, in a prominent and accessible place where workers can easily see them. NDDOT's interviewers ask employees whether they know where the bulletin board is.

Sources: dol.gov Form WH-347 and instructions, 29 CFR 3.4, 29 CFR 5.5(a)(3). Line-by-line help: WH-347 instructions and how to fill out the WH-347 step by step.

A worked example

The rates below are illustrative placeholders. They are not North Dakota rates and not state rates of any kind, because North Dakota does not publish any. Use the wage determination attached to your own contract.

One operator on a federally funded North Dakota job. Say the wage determination in your contract shows a $32.00 base rate and a $12.50 hourly fringe rate for the classification. The crew works ten hours Monday through Friday, so 50 hours in the payroll week, the same shape as the handbook's own example, and the contract applies time and a half to the base rate for hours over 40.

LineMathAmount
Straight time40 hrs at $32.00 base$1,280.00
Overtime hours10 hrs at 1.5 x $32.00 base = $48.00$480.00
Total cash wages before fringe$1,280.00 + $480.00$1,760.00
Fringe obligation50 hrs at the $12.50 fringe rate$625.00
Total wage and fringe obligation$1,760.00 + $625.00$2,385.00
Credit for bona fide plans50 hrs at $8.00 contributed$400.00
Cash in lieu still owed50 hrs at the remaining $4.50$225.00
Cash the worker actually receives$1,760.00 + $225.00$1,985.00

Two things trip people up. The overtime multiplier runs on the base rate, so the fringe rate is not multiplied for the ten overtime hours; the handbook says it in its own 50-hour example, fringe at the straight rate on every hour and half the base on the ten. And the fringe obligation is owed on all 50 hours, not just the straight-time 40. Underfund the plan and the shortfall becomes cash wages, which is the $225.00 line. On the WH-347 the plan credit is a weekly dollar total in column 6B and the cash in lieu a weekly dollar total in column 6C, and in LCPtracker the handbook says benefit payments are reported each week in total amounts, so those two totals are the figures you carry over.

Want this done for your own numbers? Use the free prevailing wage calculator, split the fringe with the fringe benefit calculator, or read how to calculate fringe benefits on prevailing wage projects.

North Dakota state law vs federal Davis-Bacon

The left column is short, and that is the point of this page. Davis-Bacon applies to federally funded and federally assisted construction in North Dakota on its own authority, whatever the Legislative Assembly does or does not do.

RequirementNorth Dakota state lawFederal Davis-Bacon
Governing lawNo prevailing wage chapter in the Century CodeDavis-Bacon Act and the Related Acts
Applies toNothing by statuteFederal and federally assisted construction
Contract thresholdNone listed by dol.gov for North DakotaIn excess of $2,000
AgencyNo state prevailing wage agency; NDDOT's Civil Rights Division administers federal-aid highway contractsU.S. DOL Wage and Hour Division
Rate sourceNo state determinations issuedWage determination in the contract
Payroll frequencyNo state requirement; NDDOT requires none on state-funded-only contractsWeekly
Payroll deadline ruleNo state requirement; NDDOT: within seven calendar days after the regular payment dateWithin 7 days after the regular payment date (29 CFR 3.4(a))
FormNo state form; NDDOT takes no paper payroll at allOptional Form WH-347
Where it goesNowhere by statute; NDDOT payrolls live in LCPtracker, approved by the Prime ApproverContracting or sponsoring agency
CertificationNo state certification; NDDOT's is the LCPtracker e-signatureStatement of Compliance (29 CFR 5.5(a)(3)(ii)(C))
Record retentionNo state requirement; NDDOT: three years after completion and final acceptance3 years after completion of the contract
BreaksA 30-minute break made available on shifts over five hours with two or more employees, enforced by the state labor department, not NDDOTNo federal break law

One practical consequence worth planning for: a North Dakota contractor who crosses a state line runs into state prevailing wage schemes North Dakota does not have. Minnesota's law applies above $2,500 where a single trade is involved and $25,000 where more than one trade is involved on the dol.gov table, and Montana's above $25,000. South Dakota, like North Dakota, has none. If your crews work across borders, the North Dakota answer does not travel with them.

Sources: dol.gov state prevailing wage thresholds, dol.gov Davis-Bacon construction coverage, NDDOT handbook, sections G and K. Multi-state reading: multi-state prevailing wage compliance.

What CertifiedPayrollPro does for North Dakota work

We produce the reports. You file them with the contracting agency, hand them to the prime, or key the figures into LCPtracker. We never submit anything to any agency on your behalf.

Federal WH-347

Federally funded North Dakota work generates the Rev. January 2025 WH-347 with its Statement of Compliance, carrying every item on NDDOT's list of contents, ready to hand in where a WH-347 is what gets handed in.

Weekly payroll math

Straight time, overtime on the base rate, fringe on all hours, and the cash-in-lieu remainder calculated per worker per week, the way NDDOT's handbook lays it out.

Underpayment flags

The wage check flags pay below the rate you entered for a classification before you certify, plus missing fringe breakdowns; Lydia, our AI assistant, explains each flag.

Wage data for every state

Look up Davis-Bacon rates by county and construction type for North Dakota and the other 49 states.

Crews that cross state lines

Link a determination to each project location, which matters for North Dakota contractors bidding in Minnesota, Montana or South Dakota.

A 3-year record trail

Certified reports stay in your account, which is how you satisfy the federal 3-year retention requirement, and NDDOT's, without a filing cabinet.

To be straight with you: the state filings we offer today are California's A-1-131 and DIR eCPR XML, the Illinois CTP portal upload file, the New York certified payroll XML and New Jersey's MW-562. North Dakota has no state prevailing wage form to build, NDDOT takes certified payroll only inside LCPtracker, and we are not an LCPtracker payroll interface: the LCPtracker CSV we export is a flat table of the week's figures, not LCPtracker's own upload template, so on NDDOT work you key the payroll into LCPtracker yourself and certify it there.

Bidding a federally funded North Dakota job?

Start CertifiedPayrollPro free. The first 3 certified payroll reports are on us, and no credit card is required.

Start Free Trial

North Dakota Prevailing Wage FAQ

Does North Dakota have a prevailing wage law in 2026?▾

No. The U.S. Department of Labor's table of state prevailing wage contract thresholds lists no threshold for North Dakota and groups it with the states that have no prevailing wage law. The North Dakota Century Code has no prevailing wage chapter: Title 34, Labor and Employment, runs from General Provisions through Minimum Wages and Hours, Child Labor and Wage Collection without one, and chapter 48-01.2, Public Improvement Bids and Contracts, covers thresholds, advertising, bonds and payment and has no wage section. The state Department of Labor and Human Rights' wage and hour page lists wage claims, youth employment, independent contractor verification and licensing, and says nothing about prevailing wage or certified payroll. There is no state rate schedule to look up for a 2026 North Dakota job.

Did North Dakota repeal a prevailing wage law?▾

A repeal year circulates online for North Dakota. The federal threshold table carries no note beside North Dakota, unlike Idaho (repealed 1985) or Kansas (repealed 1987), and we found nothing in the Century Code to support a year, so we do not print one. For a bid it does not matter which way the history went: there are no state rates and no state certified payroll statute either way.

So are there any North Dakota prevailing wage rates for 2026?▾

Not state ones. If someone hands you a North Dakota prevailing wage rate sheet for a 2026 job, it is almost certainly a federal Davis-Bacon wage determination, a rate written into the contract by the awarding agency, or a collective bargaining agreement rate you signed. Those are all real obligations. None of them is a state prevailing wage determination, because North Dakota does not issue any. On NDDOT work, the handbook says the highway wage decision is posted on its labor compliance page by published date, and the decision incorporated into your contract is the one you pay.

Does federal Davis-Bacon still apply to North Dakota projects?▾

Yes, and this is the part that matters most. Davis-Bacon applies on its own federal authority to contracts in excess of $2,000 for construction, alteration, or repair, including painting and decorating, of public buildings or public works, and the Related Acts extend prevailing wage requirements to construction that federal agencies assist through grants, loans, loan guarantees and insurance. Section IV of Form FHWA-1273, the federal-aid contract provisions the handbook says every federally funded NDDOT contract and subcontract carries, is applicable to all Federal-aid construction projects exceeding $2,000 and to all related subcontracts and lower-tier subcontracts regardless of subcontract size. NDDOT's handbook adds that if a non-federally-funded project is tied to a federally funded project, the entire contract is considered federally funded and is subject to Davis-Bacon, with weekly certified payrolls for all portions of it.

Do I file certified payroll on a state-funded-only NDDOT job?▾

Not for NDDOT. Its handbook says, in its own words, that weekly certified payrolls are not required by NDDOT for employees working on state funded only contracts, and are generally not required for employees working at locations considered not to be the site of the work of a federally funded highway construction contract. Read the contract anyway. A city or county can write reporting into its specifications, and that binds you as a contract term even with no statute behind it.

How do I submit certified payroll to NDDOT?▾

In LCPtracker, and only there. NDDOT's contract special provision on mandatory automated certified payroll says all contractors on NDDOT federal-aid projects, including city and county projects, must file weekly certified payrolls, that NDDOT requires the use of LCPtracker, and that certified payrolls in paper form will no longer be accepted. After award the prime designates a Prime Approver, the Civil Rights Division sets up that account, and the prime assigns its subcontractors to the project in LCPtracker; a subcontractor that is not on NDDOT's Approved Subcontractor List or Qualified Contractor List has to register and be placed on one before it can be entered. Logins come from the Civil Rights Division at 701-328-2605 or 701-328-2576.

When is an NDDOT certified payroll due?▾

The handbook says payrolls and compliance statements are due within seven calendar days after the regular payment date of the payroll period, which is the same trigger the federal regulation uses, within 7 days after the regular payment date (29 CFR 3.4(a)). Then comes the step people miss: until the prime contractor reviews and electronically approves the payrolls of itself and its subcontractors through the Prime Approver account, they are not viewable by the Project Engineer and, in the special provision's words, not deemed submitted to the NDDOT. A subcontractor's payroll sitting unapproved is a late payroll.

What must an NDDOT weekly certified payroll contain?▾

The handbook lists it: the employee's full name and an individual identifying number such as the last four digits of the Social Security number, which LCPtracker takes as XXX-XX-last 4; the correct job classification or classifications; the hourly wage rates, regular and overtime, and the fringe benefit totals paid into plans or the hourly rate paid in cash, or both where the fringe is mixed; the daily and weekly hours worked in each classification including actual overtime hours; total earnings; itemized deductions per employee; and the actual or net wages paid. A telephone number is encouraged, not required. Addresses and Social Security numbers are kept by the contractor and provided on request to NDDOT, USDOL, FHWA or the prime, and the handbook says complete Social Security numbers should never be placed on paper payrolls.

Who signs the NDDOT certified payroll, and is there a paper Statement of Compliance?▾

There is no paper one. The handbook says that for LCPtracker to accept payrolls, the contractor must set up an E-Signature on LCPtracker and must certify each payroll electronically, and that the electronic signature is the equivalent of a pen and ink signature. The certification is the familiar three-part statement: the weekly payroll contains the information required and is correct and complete; the persons employed on the contract have been paid the full weekly wages earned without rebate and with no deductions other than the permissible ones; and each employee has been paid not less than the applicable wage rate and fringe benefits, or cash equivalent, for the classification of work performed under the wage decision incorporated into the contract.

How does NDDOT want overtime and fringe figured?▾

Overtime on the basic rate of pay, which under the Contract Work Hours and Safety Standards Act is the straight time hourly rate, cannot be less than the basic hourly rate in the Davis-Bacon decision, and is the rate actually paid when that is higher; fringe contributions and cash fringe are excluded from the overtime computation. Fringe is owed on all regular and overtime hours and is not calculated at time and a half: the handbook's example is 50 hours at the base plus fringe and 10 hours at half the base. When an employee works two classifications in a week the contractor may use the basic rate in effect when the overtime hours were worked or a weighted average, and the handbook's own two-classification example uses the weighted average. Where an employee works two or more separately awarded contracts under different districts, cities, counties or consultants, NDDOT strongly recommends the rate in effect, and a weighted average has to be explained, with every calculation, in LCPtracker's comments on the certification page. Davis-Bacon hours and commercial hours in the same week go on two separate weekly payrolls.

How long do I keep NDDOT payroll records?▾

The handbook says all payroll records must be maintained and preserved by the contractor for three years following the completion and final acceptance of the project, available at the request of FHWA, USDOL and NDDOT at any time during that period, and that all records in LCPtracker will be retained by NDDOT for the required statutory period. Keep your own set regardless: the handbook puts the burden of proof on the prime and its subcontractors and says a failure to keep accurate records may cause NDDOT to find for the complainant in a wage dispute.

How does CertifiedPayrollPro help North Dakota contractors?▾

We produce the certified payroll records you hand in on federally funded North Dakota work. Enter hours by day and classification and we calculate straight time, overtime on the base rate, the fringe credit and cash in lieu, then generate the Rev. January 2025 federal WH-347 with its Statement of Compliance. The wage check flags pay below the rate you entered for a classification before you certify, and Lydia, our AI assistant, explains each flag. To be straight with you: NDDOT takes certified payroll only inside LCPtracker, and we are not an LCPtracker payroll interface. The LCPtracker CSV we export is a flat table of the week's figures, not LCPtracker's own upload template, so on NDDOT work you key the payroll into LCPtracker yourself and certify it there, and our WH-347 is the record you keep. On federally assisted housing, water, sewer, airport and building work, where the funding agency or the prime takes a WH-347, we produce exactly what they ask for. You file with the agency either way; we do not submit anything to any agency on your behalf.

Get the North Dakota payroll math right the first time

Start free. Enter hours by day and classification, and get a certified payroll report with the base rate, overtime, fringe credit and cash in lieu already worked out.

Start Free Trial

3 free reports · 14 free days on your first plan · $0 setup

North Dakota Prevailing Wage Rates 2026: No State Law | CertifiedPayrollPro